CDS Committee Meeting
Tell a Friend About This EventTell a Friend
 

1/22/2020
When: 10:00 AM
Where: Charlotte Water, Dukes Treatment Plant
7980 Babe Stillwell Farm Rd
Huntersville, North Carolina  28078
United States
Contact: Philip Joyner
919-996-2398

« Go to Upcoming Event List  

NC AWWA-WEA

Collection and Distribution Committee Meeting

 

Request for Approval of PDH and Wastewater Hours

for

Educational Presentation at Committee Meeting

 

 

 

Location of event

Lee Dukes Water Treatment Plant, 7980 Babe Stillwell Farm Rd, Huntersville, NC 28078

 

Date/time of event

January 22, 2020 from noon to 1:00 pm

 

Short description of event/topics covered

Topic: Microtunneling & Conventional Utility Tunneling in North Carolina

Between 1993 and 2019, Bradshaw Construction has constructed over 20 tunnel projects in North Carolina covering at total distance of more than four miles and ranging in size from 42 inches to as large as 13 feet. Tunneling methods included using various hand-mining techniques, conventional tunnel boring machines and microtunneling. The tunnels have been supported by everything from liner plates and shotcrete to steel casing and RCP installed by pipe jacking. North Carolina geology at water & sewer pipeline elevations is a complicated mix of hard rock and alluvial deposits, where multiple geologic units are encountered in any given tunnel. The presentation will try to illuminate a contractor’s perspective on the planning and execution of these tunnel projects.

 

The event speakers

Matt Webb

Matt Webb has over 3 years in the tunnel industry with Bradshaw Construction after graduating from Colorado School of Mines in Golden, CO in 2015 with a BS in Mining Engineering.  Matt is Bradshaw’s Project Manager for North Carolina, managing numerous recent projects across the mid-Atlantic region, primarily in Charlotte.

Membership Software Powered by YourMembership  ::  Legal